Contract clauses in EPC thermal power projects : (Record no. 22875)

MARC details
000 -LEADER
fixed length control field 03491nas a2200409 a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818085032.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 101108s2009 th uu|m rtt 0| a1eng d
035 ## - SYSTEM CONTROL NUMBER
System control number .b1208590x
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Proj. no.CM-09-37
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Bui Tien Dung
245 10 - TITLE STATEMENT
Title Contract clauses in EPC thermal power projects :
Remainder of title a case study of Hai Phong Thermal Power Project
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pathum Thani, Thailand :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 2009
300 ## - PHYSICAL DESCRIPTION
Extent 1 online resource (39 leaves) :
Other physical details ill.
490 1# - SERIES STATEMENT
Series statement Project ;
Volume/sequential designation no. CM-09-37
500 ## - GENERAL NOTE
General note A thesis submitted in partialfulfillment of the requirements for the degree of Master of Engineering in Construction Engineering and Infrastructure Management
502 ## - DISSERTATION NOTE
Dissertation note Project (M. Eng.) - Asian Institute of Technology, 2009
520 ## - SUMMARY, ETC.
Summary, etc. Nowadays, the EPC contract is very wide applied inenergy industry (specially in thermalprojects) in this Region for developing anenergy field project, this EPC contract is as a2fast track3 tool to reduce the project duration. In order to execute this kind of contractsuccessfully in term of the benefit for all involved parties, it is necessary to focus on somekey factors that shall be affected on the project during execution phase i.e...contract termsand conditions clauses. Therefore, understanding and interpreting the application of termand condition clauses clearly in EPC contract will help the project to be executed andmonitored by using the proper manning levelin accordance with project specification andthe project will be achieved its goals without the minimized disputations and conflictshappening.This study will also discuss on the advantages and disadvantages of EPC contract fromboth Contractor and Project Company{u2019}s point of view and how to manage the EPC contractin accordance with term and condition clauses stipulated in the signed contract documents;how to resolve problems by understanding the contract clauses. However, the improvementof some major clauses are still needed in order to specify and define clearly the duties andresponsibilities as well as obligations of involved parties to minimize the conflicts,interfaces, risks and disputes that can be happened during the project execution phase.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Hai Phong Thermal Power Project
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction contracts
Geographic subdivision Vietnam
-- Hai Phong
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Hadikusumo, Bonaventura H. W.,
Relator term Chairperson
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Chotchai Charoenngam,
Relator term Examination Committee
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Chiu, Gregory L.F.,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element ELECTRICITY OF VIETNAM,
Relator term Scholarship Donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Project ;
Volume/sequential designation no. CM-09-37
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B00947">http://203.159.5.9/ait-thesis/detail.php?q=B00947</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b1208590x
b mnait
c u
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 240329
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 0
Cataloger's initials, CIN (RLIN) 101108
First date, FD (RLIN) m
-- a
-- u
-- 0
962 ## -
-- 000:001:PDF:b1208590:000209:0:0:0:0:0:0
-- Abstract-AIT Project no.CM-09-37
-- n
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 22-AIT Thesis (Replacement)
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120686554
CREATED CREATED : 2012-08-31
RECORD Id RECORD # : i12692633
LPATRON LPATRON : 1025807
LCHKIN LCHKIN : 2016-12-01
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 1
-- TOT RENEW : 1
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120232334
CREATED CREATED : 2016-05-04
RECORD Id RECORD # : i12925573
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026   AIT Proj. no.CM-09-37 30050120686554 18/08/2026 3 18/08/2026 22-AIT Thesis (Replacement)
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026   AIT Proj. no.CM-09-37 30050120232334 18/08/2026   18/08/2026 40-Archives
คัดลอกแล้ว!