Contract clauses in EPC thermal power projects : a case study of Hai Phong Thermal Power Project

By: Call Number: AIT Proj. no.CM-09-37 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Project ; no. CM-09-37Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2009Description: 1 online resource (39 leaves) : illSubject(s): Online resources: Dissertation note: Project (M. Eng.) - Asian Institute of Technology, 2009 Summary: Nowadays, the EPC contract is very wide applied inenergy industry (specially in thermalprojects) in this Region for developing anenergy field project, this EPC contract is as a2fast track3 tool to reduce the project duration. In order to execute this kind of contractsuccessfully in term of the benefit for all involved parties, it is necessary to focus on somekey factors that shall be affected on the project during execution phase i.e...contract termsand conditions clauses. Therefore, understanding and interpreting the application of termand condition clauses clearly in EPC contract will help the project to be executed andmonitored by using the proper manning levelin accordance with project specification andthe project will be achieved its goals without the minimized disputations and conflictshappening.This study will also discuss on the advantages and disadvantages of EPC contract fromboth Contractor and Project Company{u2019}s point of view and how to manage the EPC contractin accordance with term and condition clauses stipulated in the signed contract documents;how to resolve problems by understanding the contract clauses. However, the improvementof some major clauses are still needed in order to specify and define clearly the duties andresponsibilities as well as obligations of involved parties to minimize the conflicts,interfaces, risks and disputes that can be happened during the project execution phase.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Proj. no.CM-09-37 (Browse shelf(Opens below)) 3 Available 30050120686554
40-Archives Asian Institute of Technology Library Archives AIT Proj. no.CM-09-37 (Browse shelf(Opens below)) Available 30050120232334

A thesis submitted in partialfulfillment of the requirements for the degree of Master of Engineering in Construction Engineering and Infrastructure Management

Project (M. Eng.) - Asian Institute of Technology, 2009

Nowadays, the EPC contract is very wide applied inenergy industry (specially in thermalprojects) in this Region for developing anenergy field project, this EPC contract is as a2fast track3 tool to reduce the project duration. In order to execute this kind of contractsuccessfully in term of the benefit for all involved parties, it is necessary to focus on somekey factors that shall be affected on the project during execution phase i.e...contract termsand conditions clauses. Therefore, understanding and interpreting the application of termand condition clauses clearly in EPC contract will help the project to be executed andmonitored by using the proper manning levelin accordance with project specification andthe project will be achieved its goals without the minimized disputations and conflictshappening.This study will also discuss on the advantages and disadvantages of EPC contract fromboth Contractor and Project Company{u2019}s point of view and how to manage the EPC contractin accordance with term and condition clauses stipulated in the signed contract documents;how to resolve problems by understanding the contract clauses. However, the improvementof some major clauses are still needed in order to specify and define clearly the duties andresponsibilities as well as obligations of involved parties to minimize the conflicts,interfaces, risks and disputes that can be happened during the project execution phase.