Results
|
|
1.
|
|
|
|
|
2.
|
|
Collaborative strategy between stakeholders of hydropower and power intensive industry in Bhutan by Series: Asian Institute of Technology. Thesis ; no. CM-09-24
Material type: Continuing resource; Type of continuing resource:
series
Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2009
Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2009
Availability: Items available for loan: Asian Institute of Technology Library (6)Call number: AIT Thesis no.CM-09-24, AIT Thesis no.CM-09-24, AIT Thesis no.CM-09-24, AIT Thesis no.CM-09-24, AIT Thesis no.CM-09-24, AIT Thesis no.CM-09-24.
star rating
Average : 0.0 out of 5 stars
|
|
|
3.
|
|
|
|
|
4.
|
|
|
|
|
5.
|
|
|
|
|
6.
|
|
Static voltage stability study on Bhutan interconnected power grid by Series: Asian Institute of Technology. Thesis ; no. ET-09-12
Material type: Continuing resource; Type of continuing resource:
series
Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2009
Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2009
Availability: Items available for loan: Asian Institute of Technology Library (2)Call number: AIT Thesis no.ET-09-12, AIT Thesis no.ET-09-12.
star rating
Average : 0.0 out of 5 stars
|
|
|
7.
|
|
|