Results
|
|
1.
|
|
|
|
|
2.
|
|
|
|
|
3.
|
|
|
|
|
4.
|
|
Comparative study of water and energy use in selected manufacturing industries by Series: Asian Institute of Technology. Thesis ; no. WM-18-08
Material type: Continuing resource; Type of continuing resource:
series
Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2018
Dissertation note: Thesis (M. Eng.) - Asian Institute of Technology, 2018
Availability: Items available for loan: Asian Institute of Technology Library (3)Call number: AIT Thesis no.WM-18-08, AIT Thesis no.WM-18-08, AIT Thesis no.WM-18-08.
star rating
Average : 0.0 out of 5 stars
|
|
|
5.
|
|
|
|
|
6.
|
|
Design of a siphonic rainwater harvesting system under climate change at AIT by Series: Asian Institute of Technology. Caps. Proj ; no. CIE-18-34
Material type: Continuing resource; Type of continuing resource:
series
Publication details: Pathum Thani : Asian Institute of Technology, 2018
Dissertation note: Capstone Project (B.Sc.)-Asian Institute of Technology, 2018
Availability: Items available for loan: Asian Institute of Technology Library (3)Call number: AIT Caps. Proj. no.CIE-18-34, AIT Caps. Proj. no.CIE-18-34, AIT Caps. Proj. no.CIE-18-34.
star rating
Average : 0.0 out of 5 stars
|
|
|
7.
|
|
|
|
|
8.
|
|
|
|
|
9.
|
|
|
|
|
10.
|
|
|
|
|
11.
|
Image from Amazon.com
|
|
|
|
12.
|
|
|
|
|
13.
|
|
Performance assessment of a water supply utility in Bangkok by Series: Asian Institute of Technology. Caps. Proj ; no. CIE-18-58
Material type: Continuing resource; Type of continuing resource:
series
Publication details: Pathum Thani : Asian Institute of Technology, 2018
Dissertation note: Capstone Project (B.Sc.)-Asian Institute of Technology, 2018
Availability: Items available for loan: Asian Institute of Technology Library (3)Call number: AIT Caps. Proj. no.CIE-18-58, AIT Caps. Proj. no.CIE-18-58, AIT Caps. Proj. no.CIE-18-58.
star rating
Average : 0.0 out of 5 stars
|
|
|
14.
|
|
Performance assessment of municipal water supply management in Bangkok by Series: Asian Institute of Technology. Caps. Proj ; no. CIE-16-21
Material type: Continuing resource; Type of continuing resource:
series
Publication details: Pathum Thani : Asian Institute of Technology, 2016
Dissertation note: Capstone Project (B.Sc.)-Asian Institute of Technology, 2016
Availability: Items available for loan: Asian Institute of Technology Library (3)Call number: AIT Caps. Proj. no.CIE-16-21, AIT Caps. Proj. no.CIE-16-21, AIT Caps. Proj. no.CIE-16-21.
star rating
Average : 0.0 out of 5 stars
|
|
|
15.
|
|
Stormwater management plan by Series: Asian Institute of Technology. Caps. Proj ; no. CIE-17-01
Material type: Continuing resource; Type of continuing resource:
series
Publication details: Pathum Thani : Asian Institute of Technology, 2017
Dissertation note: Capstone Project (B.Sc.)-Asian Institute of Technology, 2017
Availability: Items available for loan: Asian Institute of Technology Library (3)Call number: AIT Caps. Proj. no.CIE-17-01, AIT Caps. Proj. no.CIE-17-01, AIT Caps. Proj. no.CIE-17-01.
star rating
Average : 0.0 out of 5 stars
|
|
|
16.
|
|
|
|
|
17.
|
|
Water security Assessment for river basins in Thailand by Series: Asian Institute of Technology. Thesis ; no. WM-19-01
Material type: Continuing resource; Type of continuing resource:
series
Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2019
Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2019
Availability: Items available for loan: Asian Institute of Technology Library (4)Call number: AIT Thesis no.WM-19-01, AIT Thesis no.WM-19-01, AIT Thesis no.WM-19-01, AIT Thesis no.WM-19-01.
star rating
Average : 0.0 out of 5 stars
|
|
|
18.
|
Image from Amazon.com
|
|