Forecasting of power distribution load in Tainan district

By: Call Number: AIT Thesis no.CS-95-12 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. CS-95-12Publication details: Bangkok : Asian Institute of Technology, 1995Description: 88 leaves + 1 online resourceSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1995 Summary: Although considerable work has been done in the past on the application of some type of systematic approach to electric power forecasting, its application to distribution load forecasting has unfortunately been somewhat neglected, especially the short-term distribution load forecasting for only certain areas like Taiwan Power Company (TPC) Tainan District. Recently years, due to the uprising of environmental protection consciousness, the land acquisition of not only power plants but also secondary substations becomes more difficult than before. Most Districts of TPC will face the embarrassment of power shortage and area rationing of power commodity predictably will be seen more often. In these circumstances, reliable short-term distribution load forecasting tools will enable TPC to plan ahead of time for peak demand and inform their customers as earlier as possible when area rationing is inevitable. Three forecasting approaches namely Neural Network, Box-Jenkins and Winters were investigated through the study cin distribution daily peak load and weekly peak load forecasting for TPC in Tainan District. The results showed that the daily peak load forecasting performance by Box-Jenkins model along with standardization method is the best among the approaches considered. For weekly peak load data the Winters' method gives the best forecasting performance with lead times from one to three weeks. For daily peak load data, the accuracy of forecasting with Box-Jenkins seasonal models is much better than that of non-seasonal models. Moreover, with standardized daily peak load data the forecasting performance is improved significantly. The Backpropagation Networks can not give a good forecasting performance when only time series data are used.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.CS-95-12 (Browse shelf(Opens below)) 1 Available 30050120675847
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.CS-95-12 (Browse shelf(Opens below)) 2 Available 30050120675706
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.CS-95-12 (Browse shelf(Opens below)) Available 30050120356299
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no.CS-95-12 (Browse shelf(Opens below)) 3 Available 30050120914972

A thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering

Thesis (M.Eng.) - Asian Institute of Technology, 1995

Although considerable work has been done in the past on the application of some type of systematic approach to electric power forecasting, its application to distribution load forecasting has unfortunately been somewhat neglected, especially the short-term distribution load forecasting for only certain areas like Taiwan Power Company (TPC) Tainan District. Recently years, due to the uprising of environmental protection consciousness, the land acquisition of not only power plants but also secondary substations becomes more difficult than before. Most Districts of TPC will face the embarrassment of power shortage and area rationing of power commodity predictably will be seen more often. In these circumstances, reliable short-term distribution load forecasting tools will enable TPC to plan ahead of time for peak demand and inform their customers as earlier as possible when area rationing is inevitable. Three forecasting approaches namely Neural Network, Box-Jenkins and Winters were investigated through the study cin distribution daily peak load and weekly peak load forecasting for TPC in Tainan District. The results showed that the daily peak load forecasting performance by Box-Jenkins model along with standardization method is the best among the approaches considered. For weekly peak load data the Winters' method gives the best forecasting performance with lead times from one to three weeks. For daily peak load data, the accuracy of forecasting with Box-Jenkins seasonal models is much better than that of non-seasonal models. Moreover, with standardized daily peak load data the forecasting performance is improved significantly. The Backpropagation Networks can not give a good forecasting performance when only time series data are used.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!